ITAC Assessment: UL0226
ITAC logo
ITAC Assessment: UL0226
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic bags and Film Sheeting
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 250,000
ft2
Annual Production 99,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $819,670 30,473,916
kWh
Electricity Demand $376,606 55,653
kW-mo/yr
Natural Gas $33,204 6,806
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,587

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $92,078 $100,203 - $92,078
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $4,020 $522 $2,971
110,492
kWh
$1,049
-
kW-mo/yr
- -
03 2.8114: Change rate schedules or other changes in utility service $15,134 - - - - $15,134
04 3.7198: Reduce / eliminate use of disposable product $433 $930 - - $433
-
lb
-
TOTAL RECOMMENDED $111,665 $101,655 $2,971
110,492
kWh
$93,127
-
kW-mo/yr
$433
-
lb
$15,134
TOTAL IMPLEMENTED $19,587 $1,452 $2,971
110,492
kWh
$1,049
-
kW-mo/yr
$433
-
lb
$15,134
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs