Assessment Year | 2001 |
---|---|
Principal Product | Steel Framing |
NAICS |
n/a
|
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
125,000
ft2
|
Annual Production | 33,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,980 | 916,352 |
kWh
|
$0.060 |
Natural Gas | $12,598 | 1,203 |
MMBtu
|
$10.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $884,001 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $839,026 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,362 | - |
$1,362
22,698
kWh
|
- | - | |
02 | 2.7132: Install timers on light switches in little used areas | $3,747 | $1,200 |
$3,747
34,950
kWh
|
- | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $44,975 | $17,844 |
$44,975
419,547
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $580 | $4,298 |
$580
5,441
kWh
|
- | - | |
05 | 3.5217: Reuse / recycle/ sell paper products | $1,077 | $52 | - |
$1,077
-
lb
|
- | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $807,300 | $190,000 | - | - | $807,300 | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $24,960 | $30,230 | - | - | $24,960 | |
TOTAL RECOMMENDED | $884,001 | $243,624 |
$50,664
482,636
kWh
|
$1,077
-
lb
|
$832,260 | ||
TOTAL IMPLEMENTED | $839,026 | $225,780 |
$5,689
63,089
kWh
|
$1,077
-
lb
|
$832,260 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs