ITAC Assessment: SF0227
ITAC logo
ITAC Assessment: SF0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Steel Framing
NAICS
n/a
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 125,000
ft2
Annual Production 33,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,980 916,352
kWh
Natural Gas $12,598 1,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $884,001 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $839,026

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,362 - $1,362
22,698
kWh
- -
02 2.7132: Install timers on light switches in little used areas $3,747 $1,200 $3,747
34,950
kWh
- -
03 2.4226: Use / purchase optimum sized compressor $44,975 $17,844 $44,975
419,547
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $580 $4,298 $580
5,441
kWh
- -
05 3.5217: Reuse / recycle/ sell paper products $1,077 $52 - $1,077
-
lb
-
06 4.111: Add equipment/ operators to reduce production bottleneck $807,300 $190,000 - - $807,300
07 4.111: Add equipment/ operators to reduce production bottleneck $24,960 $30,230 - - $24,960
TOTAL RECOMMENDED $884,001 $243,624 $50,664
482,636
kWh
$1,077
-
lb
$832,260
TOTAL IMPLEMENTED $839,026 $225,780 $5,689
63,089
kWh
$1,077
-
lb
$832,260
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs