ITAC Assessment: UL0225
ITAC logo
ITAC Assessment: UL0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Custon hardwood furniture pieces
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 162
Plant Area 138,000
ft2
Annual Production 3,500
thousand feet
Production Hrs. Annual 6,452
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,081 3,362,544
kWh
Electricity Demand $106,450 10,797
kW-mo/yr
Natural Gas $35,131 8,127
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $294,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $22,666 $14,656 - - $22,666 - -
02 2.4221: Install compressor air intakes in coolest locations $742 $65 $428
16,999
kWh
$314
-
kW-mo/yr
- - -
03 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $135,070 $761,380 $78,416
2,862,837
kWh
$41,950
-
kW-mo/yr
- $14,704
-
lb
-
04 4.212: Adopt in-house material generation $136,000 $143,925 - - - - $136,000
TOTAL RECOMMENDED $294,478 $920,026 $78,844
2,879,836
kWh
$42,264
-
kW-mo/yr
$22,666 $14,704
-
lb
$136,000
TOTAL IMPLEMENTED $22,666 $14,656 - - $22,666 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs