ITAC Assessment: UL0224
ITAC logo
ITAC Assessment: UL0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Metal stamped products
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 172,148
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,585 4,671,454
kWh
Electricity Demand $47,925 12,223
kW-mo/yr
Natural Gas $112,951 25,641
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7261: Install timers and/or thermostats $1,406 $1,200 $1,406
58,617
kWh
- -
02 3.1191: Change procedures / equipment / operating conditions $17,225 $30,000 - $17,225
-
lb
-
03 3.7198: Reduce / eliminate use of disposable product $1,800 - - - $1,800
TOTAL RECOMMENDED $20,431 $31,200 $1,406
58,617
kWh
$17,225
-
lb
$1,800
TOTAL IMPLEMENTED $18,631 $31,200 $1,406
58,617
kWh
$17,225
-
lb
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs