Assessment Year 1999
Principal Product Corrugated Packaging
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 174,000
ft2
Annual Production 583,000,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,782 5,906,800
kWh
Electricity Demand $122,624 13,441
kW-mo/yr
Electricity Fees $3,300 -
Natural Gas $4,722 911
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,756 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Water Consumption Savings
01 2.4221: Install compressor air intakes in coolest locations $1,519 $131 $871
35,463
kWh
$648
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,126 $20 $1,219
49,824
kWh
$907
-
kW-mo/yr
- -
03 3.4155: Meter waste water $4,300 - - - - $4,300
-
Tgal
04 3.6192: Use a less expensive method of waste removal $14,811 $4,765 - - $14,811
-
gal
-
TOTAL RECOMMENDED $22,756 $4,916 $2,090
85,287
kWh
$1,555
-
kW-mo/yr
$14,811
-
gal
$4,300
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs