ITAC Assessment: UL0215
ITAC logo
ITAC Assessment: UL0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Corrugated Packaging
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 106,443
ft2
Annual Production 595,867,000
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,451 5,052,755
kWh
Electricity Demand $103,485 10,707
kW-mo/yr
Natural Gas $206,810 60,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $482,224 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,579

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.7261: Install timers and/or thermostats $931 $400 - - $931
-
MMBtu
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $759 $1,452 $469
19,930
kWh
$290
-
kW-mo/yr
- - - - -
03 3.4155: Meter waste water $4,407 $2,000 - - - - - - $4,407
-
Tgal
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,307 $8,075 - - - - - $4,307 -
05 3.2176: Increase use of automation $21,820 $100,000 - - - $21,820
-
lb
- - -
06 4.611: Begin a practice of predictive / preventative maintenance $450,000 $79,800 - - - - $450,000 - -
TOTAL RECOMMENDED $482,224 $191,727 $469
19,930
kWh
$290
-
kW-mo/yr
$931
-
MMBtu
$21,820
-
lb
$450,000 $4,307 $4,407
-
Tgal
TOTAL IMPLEMENTED $22,579 $101,452 $469
19,930
kWh
$290
-
kW-mo/yr
- $21,820
-
lb
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs