ITAC Assessment: UL0209
ITAC logo
ITAC Assessment: UL0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product small electrical motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,779 2,745,897
kWh
Electricity Demand $50,380 8,656
kW-mo/yr
Natural Gas $13,320 2,753
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,249 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $2,561 $2,000 - $2,561
-
MMBtu
- -
02 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $4,743 - $4,743
151,817
kWh
- - -
03 2.7124: Make a practice of turning off lights when not needed $1,173 - $1,173
37,515
kWh
- - -
04 3.5217: Reuse / recycle/ sell paper products $2,442 - - - $2,442
-
lb
-
05 4.425: Eliminate/reduce redundant inspections $4,330 $78 - - - $4,330
TOTAL RECOMMENDED $15,249 $2,078 $5,916
189,332
kWh
$2,561
-
MMBtu
$2,442
-
lb
$4,330
TOTAL IMPLEMENTED $5,503 $78 $1,173
37,515
kWh
- - $4,330
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs