ITAC Assessment: OR0423
ITAC logo
ITAC Assessment: OR0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Gold Dore
NAICS 212221: Gold Ore Mining
SIC 1041: Gold Ores
Sales Range $100
M
to 500
M
# of Employees 414
Plant Area
n/a
Annual Production 66,875
lb
Production Hrs. Annual 8,760
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,015,600 15,890,800
kWh
Electricity Demand $89,352 29,772
kW-mo/yr
Other Energy $(-72,060.0) (-12,675)
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,543,900 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Increase in Production Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $518,000 $300,000 $518,000
8,104,000
kWh
- - -
02 4.611: Begin a practice of predictive / preventative maintenance $489,000 $410,000 n/a - - - $489,000
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $183,000 $120,860 $169,300
2,650,000
kWh
$13,700
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $35,800 $20,700 - $35,800
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $38,900 - - - $38,900
-
MMBtu
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $279,200 $2,000,000 $328,600
5,137,000
kWh
$61,600
-
kW-mo/yr
$(-111,000.0)
-
MMBtu
-
TOTAL RECOMMENDED $1,543,900 $2,851,560 $1,015,900
15,891,000
kWh
$111,100
-
kW-mo/yr
$(-72,100.0)
-
MMBtu
$489,000
TOTAL IMPLEMENTED $74,700 $20,700 - $35,800
-
kW-mo/yr
$38,900
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs