ITAC Assessment: NC0129
ITAC logo
ITAC Assessment: NC0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Textile dyeing and screen printing
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 125,000
ft2
Annual Production 165,604
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,030 8,703,693
kWh
Electricity Demand $220,416 29,467
kW-mo/yr
Natural Gas $785,704 196,572
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,679

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $25,317 $11,417 $(-201.0)
(-6,741)
kWh
$(-111.0)
-
kW-mo/yr
$25,629
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $9,492 $1,000 - - $9,492
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $132 $693 $85
2,931
kWh
$47
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $1,287 $1,678 $879
29,894
kWh
$408
-
kW-mo/yr
- -
05 2.1331: Burn a less expensive grade of fuel $29,900 $200 - - $29,900
-
MMBtu
-
06 3.4153: Use counter current rinsing to reduce waste water $8,059 $25,000 - - - $8,059
-
Tgal
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,508 $1,500 $269
(-9,086)
kWh
$(-150.0)
-
kW-mo/yr
- $1,389
-
Tgal
TOTAL RECOMMENDED $75,695 $41,488 $1,032
16,998
kWh
$194
-
kW-mo/yr
$65,021
-
MMBtu
$9,448
-
Tgal
TOTAL IMPLEMENTED $40,679 $2,878 $879
29,894
kWh
$408
-
kW-mo/yr
$39,392
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs