ITAC Assessment: MA0099
ITAC logo
ITAC Assessment: MA0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product MACHINERY FOR PLASTICS
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 825
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,430 456,917
kWh
Natural Gas $10,393 1,704
MMBtu
Fuel Oil #2 $2,098 31,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,144 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,604

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.4221: Install compressor air intakes in coolest locations $183 $500 $183
1,758
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $757 $136 $757
7,620
kWh
- -
03 2.7492: Use proper thickness of insulation on building envelope $8,540 $30,000 - $8,540
-
MMBtu
-
04 2.1332: Convert combustion equipment to burn natural gas $664 $800 - $(-1,434.0)
-
MMBtu
$2,098
-
MMBtu
TOTAL RECOMMENDED $10,144 $31,436 $940
9,378
kWh
$7,106
-
MMBtu
$2,098
-
MMBtu
TOTAL IMPLEMENTED $1,604 $1,436 $940
9,378
kWh
$(-1,434.0)
-
MMBtu
$2,098
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs