ITAC Assessment: OK0430
ITAC logo
ITAC Assessment: OK0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product wire mesh, wire screens
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 77,000
ft2
Annual Production 800
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,527 997,069
kWh
Natural Gas $10,723 2,276
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,876

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,200 $5,400 $2,200
22,860
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $1,505 $900 - $1,505
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,262 $1,173 $1,262
22,567
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $909 - $909
16,120
kWh
-
05 2.2437: Recover waste heat from equipment $305 $1,600 $305
22,860
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $191 $444 $191
3,517
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $68 - $68
1,172
kWh
-
TOTAL RECOMMENDED $6,440 $9,517 $4,935
89,096
kWh
$1,505
-
MMBtu
TOTAL IMPLEMENTED $5,876 $7,473 $4,371
61,547
kWh
$1,505
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs