ITAC Assessment: SU0126
ITAC logo
ITAC Assessment: SU0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product metal finishing
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area 110,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,550
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,115 4,996,764
kWh
Electricity Demand $93,682 11,820
kW-mo/yr
Natural Gas $471,746 68,788
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $221,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,429

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $195,247 $2,000,000 $349,772
4,996,764
kWh
$93,733
-
kW-mo/yr
$(-248,258.0)
-
MMBtu
02 2.2511: Insulate bare equipment $18,512 $3,152 - - $18,512
-
MMBtu
03 2.7111: Reduce illumination to minimum necessary levels $4,917 $307 $4,885
69,788
kWh
$32
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,232 $1,710 $1,931
27,591
kWh
$301
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $777 - $777
11,095
kWh
- -
TOTAL RECOMMENDED $221,685 $2,005,169 $357,365
5,105,238
kWh
$94,066
-
kW-mo/yr
$(-229,746.0)
-
MMBtu
TOTAL IMPLEMENTED $23,429 $3,459 $4,885
69,788
kWh
$32
-
kW-mo/yr
$18,512
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs