| Assessment Year | 2002 |
|---|---|
| Principal Product | metal finishing |
| NAICS |
n/a
|
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $10 M to 50M |
| # of Employees | 155 |
| Plant Area |
110,000
ft2
|
| Annual Production | 0
pieces
|
| Production Hrs. Annual | 4,550
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $350,115 | 4,996,764 |
kWh
|
$0.070 |
| Electricity Demand | $93,682 | 11,820 |
kW-mo/yr
|
$7.93 |
| Natural Gas | $471,746 | 68,788 |
MMBtu
|
$6.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $221,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,429 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $195,247 | $2,000,000 |
$349,772
4,996,764
kWh
|
$93,733
-
kW-mo/yr
|
$(-248,258.0)
-
MMBtu
|
|
| 02 | 2.2511: Insulate bare equipment | $18,512 | $3,152 | - | - |
$18,512
-
MMBtu
|
|
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $4,917 | $307 |
$4,885
69,788
kWh
|
$32
-
kW-mo/yr
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,232 | $1,710 |
$1,931
27,591
kWh
|
$301
-
kW-mo/yr
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $777 | - |
$777
11,095
kWh
|
- | - | |
| TOTAL RECOMMENDED | $221,685 | $2,005,169 |
$357,365
5,105,238
kWh
|
$94,066
-
kW-mo/yr
|
$(-229,746.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,429 | $3,459 |
$4,885
69,788
kWh
|
$32
-
kW-mo/yr
|
$18,512
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs