Assessment Year | 2019 |
---|---|
Principal Product | Ethanol |
NAICS | 325193: Ethyl Alcohol Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 32 |
Plant Area |
215,150
ft2
|
Annual Production | 25,000
Tgal
|
Production Hrs. Annual | 8,592
hrs
|
Location (State) | Nebraska |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $886,832 | 18,262,321 |
kWh
|
$0.049 |
Electricity Demand | $366,292 | 30,199 |
kW-mo/yr
|
$12.13 |
Electricity Fees | $2,404 | - |
|
- |
Natural Gas | $1,102,401 | 436,129 |
MMBtu
|
$2.53 |
TOTAL YEARLY COSTS | $2,357,929 | |||
RECOMMENDED SAVINGS* | $1,120,223 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,114,998 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $1,023,132 | $178,000 |
$(-17,699.0)
(-361,200)
kWh
|
$(-12,169.0)
-
kW-mo/yr
|
- | - | - | $1,053,000 | |
02 | 2.1222: Install turbulators | $66,132 | $93,000 | - | - |
$66,132
-
MMBtu
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,344 | $46,600 |
$13,344
272,362
kWh
|
- | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,390 | $24,394 |
$9,318
190,179
kWh
|
$3,072
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $5,225 | $1,600 | - | - |
$6,197
-
MMBtu
|
$(-472.0) | $(-500.0) | - | |
TOTAL RECOMMENDED | $1,120,223 | $343,594 |
$4,963
101,341
kWh
|
$(-9,096.6)
-
kW-mo/yr
|
$72,329
-
MMBtu
|
$(-472.0) | $(-500.0) | $1,053,000 | ||
TOTAL IMPLEMENTED | $1,114,998 | $341,994 |
$4,963
101,341
kWh
|
$(-9,096.6)
-
kW-mo/yr
|
$66,132
-
MMBtu
|
- | - | $1,053,000 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs