ITAC Assessment: NL0031
ITAC logo
ITAC Assessment: NL0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Ethanol
NAICS 325193: Ethyl Alcohol Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 32
Plant Area 215,150
ft2
Annual Production 25,000
Tgal
Production Hrs. Annual 8,592
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $886,832 18,262,321
kWh
Electricity Demand $366,292 30,199
kW-mo/yr
Electricity Fees $2,404 -
Natural Gas $1,102,401 436,129
MMBtu
TOTAL YEARLY COSTS $2,357,929
RECOMMENDED SAVINGS* $1,120,223 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,114,998

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.2211: Use optimum temperature $1,023,132 $178,000 $(-17,699.0)
(-361,200)
kWh
$(-12,169.0)
-
kW-mo/yr
- - - $1,053,000
02 2.1222: Install turbulators $66,132 $93,000 - - $66,132
-
MMBtu
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,344 $46,600 $13,344
272,362
kWh
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,390 $24,394 $9,318
190,179
kWh
$3,072
-
kW-mo/yr
- - - -
05 2.2135: Repair and eliminate steam leaks $5,225 $1,600 - - $6,197
-
MMBtu
$(-472.0) $(-500.0) -
TOTAL RECOMMENDED $1,120,223 $343,594 $4,963
101,341
kWh
$(-9,096.6)
-
kW-mo/yr
$72,329
-
MMBtu
$(-472.0) $(-500.0) $1,053,000
TOTAL IMPLEMENTED $1,114,998 $341,994 $4,963
101,341
kWh
$(-9,096.6)
-
kW-mo/yr
$66,132
-
MMBtu
- - $1,053,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs