ITAC Assessment: OR0786
ITAC logo
ITAC Assessment: OR0786
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Cases of cans and bottles of soft drinks.
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $100
M
to 500
M
# of Employees 117
Plant Area 335,000
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 5,876
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,401 8,663,680
kWh
Electricity Demand $293,994 26,047
kW-mo/yr
Electricity Fees $61,420 -
Natural Gas $219,312 25,176
MMBtu
Waste Disposal Costs
Water Usage $476,599 76,613
Tgal
TOTAL YEARLY COSTS $1,567,726
RECOMMENDED SAVINGS* $16,628 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $1,491 - $1,091
16,970
kWh
$400
-
kW-mo/yr
02 2.6231: Utilize controls to operate equipment only when needed $6,522 $2,500 $6,522
104,374
kWh
-
03 2.4226: Use / purchase optimum sized compressor $1,567 $726 $2,252
36,042
kWh
$(-685.0)
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $7,048 $108,930 $4,503
75,928
kWh
$2,545
-
kW-mo/yr
TOTAL RECOMMENDED $16,628 $112,156 $14,368
233,314
kWh
$2,260
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs