ITAC Assessment: UL0204
ITAC logo
ITAC Assessment: UL0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic Aerosol Caps, Tumblers, and Buckets
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 420,000
ft2
Annual Production 1,500,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,308,800 56,584,702
kWh
Electricity Demand $619,531 8,986
kW-mo/yr
Natural Gas $25,221 5,406
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $222,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.4226: Use / purchase optimum sized compressor $54,505 $140,960 $54,505
543,962
kWh
- -
02 3.7198: Reduce / eliminate use of disposable product $162,300 - - - $162,300
-
lb
03 3.1161: Eliminate/reduce an operation $5,360 - - $5,360
-
gal
-
TOTAL RECOMMENDED $222,165 $140,960 $54,505
543,962
kWh
$5,360
-
gal
$162,300
-
lb
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs