Assessment Year | 1998 |
---|---|
Principal Product | Shelving from cold rolled steel |
NAICS |
n/a
|
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
120,000
ft2
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,408 | 4,605,803 |
kWh
|
$0.026 |
Electricity Demand | $78,241 | 9,528 |
kW-mo/yr
|
$8.21 |
Electricity Fees | $21,819 | - |
|
- |
Natural Gas | $109,509 | 33,874 |
MMBtu
|
$3.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $229,577 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,777 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $2,115 | $65 |
$2,115
50,410
kWh
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $9,100 | $20,100 | - |
$9,100
-
MMBtu
|
- | - | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $762 | $15 |
$762
15,533
kWh
|
- | - | - | |
04 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $17,900 | $8,860 | - | - |
$17,900
-
lb
|
- | |
05 | 3.1161: Eliminate/reduce an operation | $109,700 | $16,000 | - | - |
$109,700
-
lb
|
- | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $90,000 | $155,600 | - | - | - | $90,000 | |
TOTAL RECOMMENDED | $229,577 | $200,640 |
$2,877
65,943
kWh
|
$9,100
-
MMBtu
|
$127,600
-
lb
|
$90,000 | ||
TOTAL IMPLEMENTED | $20,777 | $8,940 |
$2,877
65,943
kWh
|
- |
$17,900
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs