ITAC Assessment: GT0310
ITAC logo
ITAC Assessment: GT0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CARBONLESS PAPER
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area
n/a
Annual Production 96,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $493,769 8,735,932
kWh
Natural Gas $121,040 22,781
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,060 $300 - $1,060
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,080 $2,000 - $7,080
-
MMBtu
03 2.2511: Insulate bare equipment $220 $140 - $220
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,325 $2,375 $4,325
76,495
kWh
-
05 2.4133: Use most efficient type of electric motors $582 $2,216 $582
10,258
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $18,930 $41,000 $18,930
334,994
kWh
-
TOTAL RECOMMENDED $32,197 $48,031 $23,837
421,747
kWh
$8,360
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs