ITAC Assessment: AM0388
ITAC logo
ITAC Assessment: AM0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Polyethylene drums
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 35,000
ft2
Annual Production 712,000
pieces
Production Hrs. Annual 8,104
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,269 5,739,760
kWh
Electricity Demand $77,245 12,334
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $22,600 $23,800 - $22,600
-
kW-mo/yr
- - -
02 4.821: Pay bills on time to avoid late fees $3,700 - - - - - $3,700
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,550 $500 $3,550
80,760
kWh
- - - -
04 3.5316: Contract a wood pallet recycling company $2,200 - - - $2,200
-
lb
- -
05 2.4133: Use most efficient type of electric motors $2,920 $4,211 $1,940
44,100
kWh
$980
-
kW-mo/yr
- - -
06 2.4314: Use synthetic lubricant $930 - $630
14,300
kWh
$300
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $745 $310 $115
2,660
kWh
$45
-
kW-mo/yr
- $585 -
TOTAL RECOMMENDED $36,645 $28,821 $6,235
141,820
kWh
$23,925
-
kW-mo/yr
$2,200
-
lb
$585 $3,700
TOTAL IMPLEMENTED $31,525 $24,610 $4,295
97,720
kWh
$22,945
-
kW-mo/yr
- $585 $3,700
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs