Assessment Year | 1997 |
---|---|
Principal Product | office furniture |
NAICS |
n/a
|
SIC | 2521: Wood Office Furniture |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
162,576
ft2
|
Annual Production | 9,000
pieces
|
Production Hrs. Annual | 2,250
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,637 | 1,440,504 |
kWh
|
$0.038 |
Electricity Demand | $29,478 | 4,316 |
kW-mo/yr
|
$6.83 |
Natural Gas | $16,564 | 7,539 |
MMBtu
|
$2.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,500 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,839 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $135 | $3,650 |
$69
1,758
kWh
|
$66
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $289 | $2,813 |
$161
4,396
kWh
|
$128
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $526 | $87 |
$266
7,034
kWh
|
$260
-
kW-mo/yr
|
- | - | - | |
04 | 3.1191: Change procedures / equipment / operating conditions | $8,150 | - | - | - | - |
$8,150
-
lb
|
- | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,000 | $17,500 | - | - |
$5,000
-
lb
|
- | - | |
06 | 4.431: Train operators for maximum operating efficiency | $19,400 | $3,600 | - | - | - | - | $19,400 | |
TOTAL RECOMMENDED | $33,500 | $27,650 |
$496
13,188
kWh
|
$454
-
kW-mo/yr
|
$5,000
-
lb
|
$8,150
-
lb
|
$19,400 | ||
TOTAL IMPLEMENTED | $32,839 | $23,913 |
$161
4,396
kWh
|
$128
-
kW-mo/yr
|
$5,000
-
lb
|
$8,150
-
lb
|
$19,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs