ITAC Assessment: UL0178
ITAC logo
ITAC Assessment: UL0178
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aluminum Alloys
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 105,403
ft2
Annual Production 114,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,703 3,007,913
kWh
Electricity Demand $31,713 13,056
kW-mo/yr
Natural Gas $894,190 244,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,960,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.4224: Upgrade controls on compressors $7,200 $1,500 $7,200
249,707
kWh
- - - - -
02 2.2511: Insulate bare equipment $455 $1,000 - - - $455
-
MMBtu
- -
03 2.2515: Use optimum thickness insulation $56 $40 - - - $56
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $425 $14,240 $364
12,603
kWh
$61
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $348 $2,270 $298
10,258
kWh
$50
-
kW-mo/yr
- - - -
06 2.3212: Optimize plant power factor $2,200 $4,270 - - $2,200 - - -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $500 - - - - - $500
-
lb
-
08 3.5313: Increase amount of waste recovered for resale $260 - - - - - $260
-
lb
-
09 3.5311: Recover and reuse waste material $36,000 - - - - - $36,000
-
lb
-
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $13,400 $30,000 - - - - $13,400
-
lb
-
11 4.212: Adopt in-house material generation $2,900,000 $1,500,000 - - - - - $2,900,000
TOTAL RECOMMENDED $2,960,844 $1,553,320 $7,862
272,568
kWh
$111
-
kW-mo/yr
$2,200 $511
-
MMBtu
$50,160
-
lb
$2,900,000
TOTAL IMPLEMENTED $13,748 $32,270 $298
10,258
kWh
$50
-
kW-mo/yr
- - $13,400
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs