ITAC Assessment: UL0158
ITAC logo
ITAC Assessment: UL0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Plastic Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 57,000
ft2
Annual Production 242,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,457 8,682,005
kWh
Electricity Demand $145,807 14,462
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $617 $2,882 $437
24,619
kWh
$180
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $494 $14,360 $272
15,533
kWh
$222
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,141 $87 $627
35,463
kWh
$514
-
kW-mo/yr
- -
04 3.1191: Change procedures / equipment / operating conditions $33,525 $3,500 - - $60
-
lb
$33,465
05 3.5311: Recover and reuse waste material $2,984 - - - $2,984
-
lb
-
TOTAL RECOMMENDED $38,761 $20,829 $1,336
75,615
kWh
$916
-
kW-mo/yr
$3,044
-
lb
$33,465
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs