Assessment Year | 1996 |
---|---|
Principal Product | Edible Oils and Shortenings |
NAICS |
n/a
|
SIC | 2079: Shortening, Table Oils, Margarine, and Other Edible Fats and Oils, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 155 |
Plant Area |
55,000
ft2
|
Annual Production | 225,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $348,371 | 14,178,488 |
kWh
|
$0.025 |
Electricity Demand | $194,385 | 27,679 |
kW-mo/yr
|
$7.02 |
Natural Gas | $202,407 | 41,799 |
MMBtu
|
$4.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $222,286 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,626 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,677 | $2,000 | - | - |
$4,677
-
MMBtu
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,243 | $40 |
$893
36,342
kWh
|
$350
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $591 | $44 |
$425
17,292
kWh
|
$166
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $826 | $18,690 |
$566
23,154
kWh
|
$260
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,949 | $9,950 |
$4,228
172,040
kWh
|
$1,721
-
kW-mo/yr
|
- | - | - | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $209,000 | $330,000 | - | - | - |
$118,000
-
Tgal
|
$91,000 | |
TOTAL RECOMMENDED | $222,286 | $360,724 |
$6,112
248,828
kWh
|
$2,497
-
kW-mo/yr
|
$4,677
-
MMBtu
|
$118,000
-
Tgal
|
$91,000 | ||
TOTAL IMPLEMENTED | $10,626 | $11,950 |
$4,228
172,040
kWh
|
$1,721
-
kW-mo/yr
|
$4,677
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs