ITAC Assessment: UL0153
ITAC logo
ITAC Assessment: UL0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Forged Steel Pieces
NAICS
n/a
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 85,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 4,800
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $399,319 15,729,191
kWh
Electricity Demand $351,472 49,921
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,723

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $265 $6,150 $157
6,155
kWh
$108
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $68 $227 $45
1,758
kWh
$23
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $3,723 $85 $2,202
78,839
kWh
$1,521
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,786 $80 $1,451
57,151
kWh
$1,335
-
kW-mo/yr
- - -
05 3.4155: Meter waste water $5,875 $975 - - $5,875
-
Tgal
- -
06 3.1191: Change procedures / equipment / operating conditions $12,250 $6,000 - - - $250
-
lb
$12,000
TOTAL RECOMMENDED $24,967 $13,517 $3,855
143,903
kWh
$2,987
-
kW-mo/yr
$5,875
-
Tgal
$250
-
lb
$12,000
TOTAL IMPLEMENTED $3,723 $85 $2,202
78,839
kWh
$1,521
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs