Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Books and Cassettes for Blind
NAICS
n/a
SIC 2731: Books: Publishing, or Publishing and Printing
Sales Range $10
M
to 50
M
# of Employees 340
Plant Area 286,000
ft2
Annual Production 7,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,960 4,524,912
kWh
Natural Gas $23,891 6,421
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $482 $40 n/a $482
9,672
kWh
02 2.4221: Install compressor air intakes in coolest locations $177 $54 n/a $177
3,517
kWh
03 2.3212: Optimize plant power factor $20,120 $10,918 n/a $20,120
-
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $924 $1,700 n/a $924
18,757
kWh
05 2.7111: Reduce illumination to minimum necessary levels $2,117 $3,716 n/a $2,117
66,530
kWh
TOTAL RECOMMENDED $23,820 $16,428 $23,820
98,476
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs