ITAC Assessment: MZ0114
ITAC logo
ITAC Assessment: MZ0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fabricated Structural Steel
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range less than $500
k
# of Employees 60
Plant Area 185,000
ft2
Annual Production 7,200
ton
Production Hrs. Annual 3,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,864 837,012
kWh
Electricity Demand $12,973 5,136
kW-mo/yr
Electricity Fees $5,073 -
Natural Gas $24,708 2,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,701

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7135: Install occupancy sensors $8,005 $8,200 $6,977
100,969
kWh
$1,028
-
kW-mo/yr
-
02 2.7144: Install spectral reflectors / delamp $6,340 $9,450 $5,512
79,765
kWh
$828
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $3,715 $10,000 - - $3,715
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,771 $293 $1,545
22,366
kWh
$226
-
kW-mo/yr
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $661 $1,000 - $661
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $338 $50 $295
4,262
kWh
$43
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $252 $175 $219
3,166
kWh
$33
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,082 $29,168 $14,548
210,528
kWh
$2,819
-
kW-mo/yr
$3,715
-
MMBtu
TOTAL IMPLEMENTED $8,701 $9,968 $7,571
109,559
kWh
$1,130
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs