Assessment Year | 2013 |
---|---|
Principal Product | Fabricated Structural Steel |
NAICS | 332312: Fabricated Structural Metal Manufacturing |
SIC | 3441: Fabricated Structural Metal |
Sales Range | less than $500 k |
# of Employees | 60 |
Plant Area |
185,000
ft2
|
Annual Production | 7,200
ton
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,864 | 837,012 |
kWh
|
$0.069 |
Electricity Demand | $12,973 | 5,136 |
kW-mo/yr
|
$2.53 |
Electricity Fees | $5,073 | - |
|
- |
Natural Gas | $24,708 | 2,854 |
MMBtu
|
$8.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,082 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,701 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $8,005 | $8,200 |
$6,977
100,969
kWh
|
$1,028
-
kW-mo/yr
|
- | |
02 | 2.7144: Install spectral reflectors / delamp | $6,340 | $9,450 |
$5,512
79,765
kWh
|
$828
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $3,715 | $10,000 | - | - |
$3,715
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,771 | $293 |
$1,545
22,366
kWh
|
$226
-
kW-mo/yr
|
- | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $661 | $1,000 | - |
$661
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $338 | $50 |
$295
4,262
kWh
|
$43
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $252 | $175 |
$219
3,166
kWh
|
$33
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $21,082 | $29,168 |
$14,548
210,528
kWh
|
$2,819
-
kW-mo/yr
|
$3,715
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,701 | $9,968 |
$7,571
109,559
kWh
|
$1,130
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs