ITAC Assessment: UL0138
ITAC logo
ITAC Assessment: UL0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Corrugated Containers
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 175,000
ft2
Annual Production 71,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $318,107 5,022,274
kWh
Natural Gas $73,402 44,429
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,046 $6,889 $4,046
63,892
kWh
-
02 2.4133: Use most efficient type of electric motors $408 $725 $408
6,448
kWh
-
03 2.3212: Optimize plant power factor $28,107 $27,720 $28,107
-
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,945 $50 $8,945
141,559
kWh
-
05 2.3212: Optimize plant power factor $4,224 $3,600 $4,224
-
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $1,170 $60 $1,170
18,464
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,987 $2,000 - $1,987
-
MMBtu
TOTAL RECOMMENDED $48,887 $41,044 $46,900
230,363
kWh
$1,987
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs