Assessment Year | 2007 |
---|---|
Principal Product | Power generation turbines |
NAICS | 335312: Motor and Generator Manufacturing |
SIC | 3621: Motors and Generators |
Sales Range | greater than $500 M |
# of Employees | 536 |
Plant Area |
250,000
ft2
|
Annual Production | 211
pieces
|
Production Hrs. Annual | 4,816
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $991,769 | 14,369,008 |
kWh
|
$0.069 |
Electricity Demand | $283,235 | 40,896 |
kW-mo/yr
|
$6.93 |
Electricity Fees | $2,574 | - |
|
- |
Natural Gas | $1,998,421 | 280,925 |
MMBtu
|
$7.11 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $36,100 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,950 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,500 | $1,500 |
$11,800
157,000
kWh
|
$2,700
-
kW-mo/yr
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,500 | $20 |
$6,100
81,700
kWh
|
$1,400
-
kW-mo/yr
|
|
03 | 2.7442: Keep doors and windows shut when not on use | $7,200 | $2,000 |
$7,200
96,400
kWh
|
- | |
04 | 2.2514: Cover open tanks | $2,500 | - |
$2,500
33,800
kWh
|
- | |
05 | 2.7311: Ventilation system to shut off when room is not in use | $1,560 | - |
$1,560
20,800
kWh
|
- | |
06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,370 | - |
$1,000
13,400
kWh
|
$370
-
kW-mo/yr
|
|
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,150 | - |
$1,150
15,370
kWh
|
- | |
08 | 2.4314: Use synthetic lubricant | $320 | - |
$260
3,500
kWh
|
$60
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $36,100 | $3,520 |
$31,570
421,970
kWh
|
$4,530
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $34,950 | $3,520 |
$30,420
406,600
kWh
|
$4,530
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs