ITAC Assessment: MO0187
ITAC logo
ITAC Assessment: MO0187
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bacon and Ham
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 187,000
ft2
Annual Production 68,300,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $655,632 15,201,348
kWh
Electricity Demand $48,505 27,090
kW-mo/yr
Natural Gas $202,342 78,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,123 $1,737 $1,997
46,307
kWh
$126
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,896 $6,584 $3,654
84,701
kWh
$242
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $455 - $434
9,965
kWh
$21
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,110 - $4,860
112,837
kWh
$250
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $23,302 $56,120 $22,158
513,775
kWh
$1,144
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $4,507 $555 $4,224
97,890
kWh
$283
-
kW-mo/yr
-
07 3.5313: Increase amount of waste recovered for resale $19,968 - - - $19,968
-
lb
TOTAL RECOMMENDED $59,361 $64,996 $37,327
865,475
kWh
$2,066
-
kW-mo/yr
$19,968
-
lb
TOTAL IMPLEMENTED $54,854 $64,441 $33,103
767,585
kWh
$1,783
-
kW-mo/yr
$19,968
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs