| Assessment Year | 1996 |
|---|---|
| Principal Product | Bacon and Ham |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $100 M to 500M |
| # of Employees | 400 |
| Plant Area |
187,000
ft2
|
| Annual Production | 68,300,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $655,632 | 15,201,348 |
kWh
|
$0.043 |
| Electricity Demand | $48,505 | 27,090 |
kW-mo/yr
|
$1.79 |
| Natural Gas | $202,342 | 78,637 |
MMBtu
|
$2.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $59,361 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $54,854 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,123 | $1,737 |
$1,997
46,307
kWh
|
$126
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,896 | $6,584 |
$3,654
84,701
kWh
|
$242
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $455 | - |
$434
9,965
kWh
|
$21
-
kW-mo/yr
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,110 | - |
$4,860
112,837
kWh
|
$250
-
kW-mo/yr
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $23,302 | $56,120 |
$22,158
513,775
kWh
|
$1,144
-
kW-mo/yr
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $4,507 | $555 |
$4,224
97,890
kWh
|
$283
-
kW-mo/yr
|
- | |
| 07 | 3.5313: Increase amount of waste recovered for resale | $19,968 | - | - | - |
$19,968
-
lb
|
|
| TOTAL RECOMMENDED | $59,361 | $64,996 |
$37,327
865,475
kWh
|
$2,066
-
kW-mo/yr
|
$19,968
-
lb
|
||
| TOTAL IMPLEMENTED | $54,854 | $64,441 |
$33,103
767,585
kWh
|
$1,783
-
kW-mo/yr
|
$19,968
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs