ITAC Assessment: GT0306
ITAC logo
ITAC Assessment: GT0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SAUCES & SALAD DRESSINGS
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 30,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,777 5,439,918
kWh
Natural Gas $81,578 13,915
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,030

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.7291: Reschedule and rearrange multiple-source heating systems $23,465 - - $51,890
-
MMBtu
$(-28,425.0)
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $565 $300 - $565
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $11,954 $20,000 - $11,954
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $187 $102 $187
3,224
kWh
- -
05 2.4133: Use most efficient type of electric motors $563 $778 $563
9,965
kWh
- -
TOTAL RECOMMENDED $36,734 $21,180 $750
13,189
kWh
$64,409
-
MMBtu
$(-28,425.0)
-
MMBtu
TOTAL IMPLEMENTED $24,030 $300 - $52,455
-
MMBtu
$(-28,425.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs