Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Vibrating conveyors
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 200,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 3,086
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,212 2,677,608
kWh
Natural Gas $44,905 11,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $961

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $961 $2,256 $961
18,757
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $240 $59 $240
4,689
kWh
-
03 2.4133: Use most efficient type of electric motors $146 $380 $146
2,931
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,074 $60 $13,074
254,982
kWh
-
05 2.7224: Reduce space conditioning during non-working hours $900 $200 - $900
-
MMBtu
TOTAL RECOMMENDED $15,321 $2,955 $14,421
281,359
kWh
$900
-
MMBtu
TOTAL IMPLEMENTED $961 $2,256 $961
18,757
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs