| Assessment Year | 1996 |
|---|---|
| Principal Product | aluminum castings |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 62 |
| Plant Area |
61,750
ft2
|
| Annual Production | 3,000,000
lb
|
| Production Hrs. Annual | 5,760
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $94,453 | 2,386,284 |
kWh
|
$0.040 |
| Electricity Demand | $64,640 | 8,789 |
kW-mo/yr
|
$7.35 |
| Electricity Fees | $1,473 | - |
|
- |
| Natural Gas | $122,486 | 31,621 |
MMBtu
|
$3.87 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,441 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $17,297 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8113: Purchase gas directly from a contract gas supplier | $14,474 | $5,900 | - | - |
$14,474
-
MMBtu
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,132 | $3,129 |
$1,853
46,014
kWh
|
$1,279
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,483 | $49 |
$1,082
26,964
kWh
|
$401
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $280 | $582 |
$205
4,982
kWh
|
$75
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $572 | $1,160 |
$384
9,379
kWh
|
$188
-
kW-mo/yr
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $469 | $77 |
$341
8,499
kWh
|
$128
-
kW-mo/yr
|
- | - | |
| 07 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $732 | $125 | - | - | - |
$732
-
lb
|
|
| 08 | 3.7211: Modify material application methods | $299 | $22 | - | - | - |
$299
-
lb
|
|
| TOTAL RECOMMENDED | $21,441 | $11,044 |
$3,865
95,838
kWh
|
$2,071
-
kW-mo/yr
|
$14,474
-
MMBtu
|
$1,031
-
lb
|
||
| TOTAL IMPLEMENTED | $17,297 | $7,208 |
$1,807
44,842
kWh
|
$717
-
kW-mo/yr
|
$14,474
-
MMBtu
|
$299
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs