| Assessment Year | 1995 |
|---|---|
| Principal Product | Extruded Aluminum Parts |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
100,000
ft2
|
| Annual Production | 3,500,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $244,347 | 4,970,399 |
kWh
|
$0.049 |
| Natural Gas | $126,304 | 34,404 |
MMBtu
|
$3.67 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,339 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,542 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,122 | $1,816 |
$3,122
63,599
kWh
|
- | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $897 | $1,476 |
$897
18,171
kWh
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,274 | $40 |
$1,274
25,791
kWh
|
- | - | - | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $708 | $1,000 | - |
$708
-
MMBtu
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $438 | $36 |
$438
8,792
kWh
|
- | - | - | |
| 06 | 3.6192: Use a less expensive method of waste removal | $15,000 | $18,720 | - | - |
$15,000
-
Tgal
|
- | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,100 | - | - | - | - |
$2,100
-
lb
|
|
| 08 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $800 | - | - | - | - |
$800
-
lb
|
|
| TOTAL RECOMMENDED | $24,339 | $23,088 |
$5,731
116,353
kWh
|
$708
-
MMBtu
|
$15,000
-
Tgal
|
$2,900
-
lb
|
||
| TOTAL IMPLEMENTED | $5,542 | $2,892 |
$4,834
98,182
kWh
|
$708
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs