Assessment Year 1995
Principal Product Extruded Aluminum Parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 100,000
ft2
Annual Production 3,500,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,347 4,970,399
kWh
Natural Gas $126,304 34,404
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,542

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,122 $1,816 $3,122
63,599
kWh
- - -
02 2.4133: Use most efficient type of electric motors $897 $1,476 $897
18,171
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,274 $40 $1,274
25,791
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $708 $1,000 - $708
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $438 $36 $438
8,792
kWh
- - -
06 3.6192: Use a less expensive method of waste removal $15,000 $18,720 - - $15,000
-
Tgal
-
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,100 - - - - $2,100
-
lb
08 3.5248: Separate and recycle scrap metal to foundry or for sale $800 - - - - $800
-
lb
TOTAL RECOMMENDED $24,339 $23,088 $5,731
116,353
kWh
$708
-
MMBtu
$15,000
-
Tgal
$2,900
-
lb
TOTAL IMPLEMENTED $5,542 $2,892 $4,834
98,182
kWh
$708
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs