ITAC Assessment: UL0114
ITAC logo
ITAC Assessment: UL0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Steel Cord
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 300,000
ft2
Annual Production 16,800
ton
Production Hrs. Annual 8,568
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,582,435 48,110,493
kWh
Natural Gas $317,429 73,014
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $143,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,207 $5,550 $3,207
97,597
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,092 $4,157 $1,092
33,118
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $5,769 $2,000 - $5,769
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $3,440 $85 $3,440
104,631
kWh
-
05 2.2437: Recover waste heat from equipment $127,600 $190,000 - $127,600
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,442 $2,370 $2,442
74,150
kWh
-
TOTAL RECOMMENDED $143,550 $204,162 $10,181
309,496
kWh
$133,369
-
MMBtu
TOTAL IMPLEMENTED $3,440 $85 $3,440
104,631
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs