| Assessment Year | 1994 |
|---|---|
| Principal Product | Steel Cord |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
300,000
ft2
|
| Annual Production | 16,800
ton
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,582,435 | 48,110,493 |
kWh
|
$0.033 |
| Natural Gas | $317,429 | 73,014 |
MMBtu
|
$4.35 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $143,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,440 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $3,207 | $5,550 |
$3,207
97,597
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,092 | $4,157 |
$1,092
33,118
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,769 | $2,000 | - |
$5,769
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $3,440 | $85 |
$3,440
104,631
kWh
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $127,600 | $190,000 | - |
$127,600
-
MMBtu
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,442 | $2,370 |
$2,442
74,150
kWh
|
- | |
| TOTAL RECOMMENDED | $143,550 | $204,162 |
$10,181
309,496
kWh
|
$133,369
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,440 | $85 |
$3,440
104,631
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs