Assessment Year | 1994 |
---|---|
Principal Product | Steel Cord |
NAICS |
n/a
|
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
300,000
ft2
|
Annual Production | 16,800
ton
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,582,435 | 48,110,493 |
kWh
|
$0.033 |
Natural Gas | $317,429 | 73,014 |
MMBtu
|
$4.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $143,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,440 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,207 | $5,550 |
$3,207
97,597
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,092 | $4,157 |
$1,092
33,118
kWh
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,769 | $2,000 | - |
$5,769
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $3,440 | $85 |
$3,440
104,631
kWh
|
- | |
05 | 2.2437: Recover waste heat from equipment | $127,600 | $190,000 | - |
$127,600
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,442 | $2,370 |
$2,442
74,150
kWh
|
- | |
TOTAL RECOMMENDED | $143,550 | $204,162 |
$10,181
309,496
kWh
|
$133,369
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,440 | $85 |
$3,440
104,631
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs