Assessment Year | 2020 |
---|---|
Principal Product | American Whiskies |
NAICS | 312140: Distilleries |
SIC | 2085: Distilled and Blended Liquors |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
50,000
ft2
|
Annual Production | 1,250
Tgal
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $47,433 | 1,552,240 |
kWh
|
$0.031 | |
Electricity Demand | $104,978 | 5,525 |
kW-mo/yr
|
$19.00 | |
Electricity Fees | $2,612 | - |
|
- | |
Natural Gas | $136,352 | 38,639 |
MMBtu
|
$3.53 | |
Waste Disposal Costs | |||||
Water Usage | $71,610 | 15,985 |
Tgal
|
$4.48 | |
Water Disposal | $22,458 | 3,173 |
Tgal
|
$7.08 | |
TOTAL YEARLY COSTS | $385,443 | ||||
RECOMMENDED SAVINGS* | $64,918 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $48,113 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $486 | $2,200 |
$258
8,316
kWh
|
$228
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $660 | - |
$352
11,340
kWh
|
$308
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7314: Reduce ventilation air | $5,372 | $4,560 |
$2,864
92,400
kWh
|
$2,508
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $4,628 | $1,586 |
$1,910
61,600
kWh
|
- | - |
$2,718
-
MMBtu
|
- | - | |
05 | 2.2442: Preheat combustion air with waste heat | $15,645 | $28,100 | - | - | - |
$15,645
-
MMBtu
|
- | - | |
06 | 2.3212: Optimize plant power factor | $10,287 | $6,825 | - | - | $10,287 | - | - | - | |
07 | 3.4151: Minimize water usage | $27,840 | $15,000 | - | - | - | - |
$10,800
-
Tgal
|
$17,040
-
Tgal
|
|
TOTAL RECOMMENDED | $64,918 | $58,271 |
$5,384
173,656
kWh
|
$3,044
-
kW-mo/yr
|
$10,287 |
$18,363
-
MMBtu
|
$10,800
-
Tgal
|
$17,040
-
Tgal
|
||
TOTAL IMPLEMENTED | $48,113 | $44,686 |
$1,910
61,600
kWh
|
- | - |
$18,363
-
MMBtu
|
$10,800
-
Tgal
|
$17,040
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs