ITAC Assessment: UK2003
ITAC logo
ITAC Assessment: UK2003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product American Whiskies
NAICS 312140: Distilleries
SIC 2085: Distilled and Blended Liquors
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 1,250
Tgal
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,433 1,552,240
kWh
Electricity Demand $104,978 5,525
kW-mo/yr
Electricity Fees $2,612 -
Natural Gas $136,352 38,639
MMBtu
Waste Disposal Costs
Water Usage $71,610 15,985
Tgal
Water Disposal $22,458 3,173
Tgal
TOTAL YEARLY COSTS $385,443
RECOMMENDED SAVINGS* $64,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
01 2.4221: Install compressor air intakes in coolest locations $486 $2,200 $258
8,316
kWh
$228
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $660 - $352
11,340
kWh
$308
-
kW-mo/yr
- - - -
03 2.7314: Reduce ventilation air $5,372 $4,560 $2,864
92,400
kWh
$2,508
-
kW-mo/yr
- - - -
04 2.2511: Insulate bare equipment $4,628 $1,586 $1,910
61,600
kWh
- - $2,718
-
MMBtu
- -
05 2.2442: Preheat combustion air with waste heat $15,645 $28,100 - - - $15,645
-
MMBtu
- -
06 2.3212: Optimize plant power factor $10,287 $6,825 - - $10,287 - - -
07 3.4151: Minimize water usage $27,840 $15,000 - - - - $10,800
-
Tgal
$17,040
-
Tgal
TOTAL RECOMMENDED $64,918 $58,271 $5,384
173,656
kWh
$3,044
-
kW-mo/yr
$10,287 $18,363
-
MMBtu
$10,800
-
Tgal
$17,040
-
Tgal
TOTAL IMPLEMENTED $48,113 $44,686 $1,910
61,600
kWh
- - $18,363
-
MMBtu
$10,800
-
Tgal
$17,040
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs