ITAC Assessment: UA0229
ITAC logo
ITAC Assessment: UA0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Fork Lift Components
NAICS 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $50
M
to 100
M
# of Employees 520
Plant Area 300,000
ft2
Annual Production 239,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,433,520 24,689,864
kWh
Electricity Demand $175,499 41,550
kW-mo/yr
Electricity Fees $57,729 -
Natural Gas $423,510 54,218
MMBtu
TOTAL YEARLY COSTS $2,090,258
RECOMMENDED SAVINGS* $153,188 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $15,905 $2,000 $13,960
240,444
kWh
$1,394
-
kW-mo/yr
$551 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,562 $6,700 $10,663
183,648
kWh
$498
-
kW-mo/yr
$401 -
03 2.1113: Reduce combustion air flow to optimum $27,038 $15,000 - - - $27,038
-
MMBtu
04 2.7241: Install outside air damper / economizer on hvac unit $78,540 $5,000 $75,818
1,305,863
kWh
- $2,722 -
05 2.4112: Install soft-start to eliminate nuisance trips $9,688 $11,100 $8,157
140,491
kWh
$1,195
-
kW-mo/yr
$336 -
06 2.7135: Install occupancy sensors $10,455 $14,400 $10,093
173,842
kWh
- $362 -
TOTAL RECOMMENDED $153,188 $54,200 $118,691
2,044,288
kWh
$3,087
-
kW-mo/yr
$4,372 $27,038
-
MMBtu
TOTAL IMPLEMENTED $27,467 $8,700 $24,623
424,092
kWh
$1,892
-
kW-mo/yr
$952 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs