| Assessment Year | 2020 |
|---|---|
| Principal Product | Fork Lift Components |
| NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
| SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
| Sales Range | $50 M to 100M |
| # of Employees | 520 |
| Plant Area |
300,000
ft2
|
| Annual Production | 239,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,433,520 | 24,689,864 |
kWh
|
$0.058 |
| Electricity Demand | $175,499 | 41,550 |
kW-mo/yr
|
$4.22 |
| Electricity Fees | $57,729 | - |
|
- |
| Natural Gas | $423,510 | 54,218 |
MMBtu
|
$7.81 |
| TOTAL YEARLY COSTS | $2,090,258 | |||
| RECOMMENDED SAVINGS* | $153,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,467 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,905 | $2,000 |
$13,960
240,444
kWh
|
$1,394
-
kW-mo/yr
|
$551 | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,562 | $6,700 |
$10,663
183,648
kWh
|
$498
-
kW-mo/yr
|
$401 | - | |
| 03 | 2.1113: Reduce combustion air flow to optimum | $27,038 | $15,000 | - | - | - |
$27,038
-
MMBtu
|
|
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $78,540 | $5,000 |
$75,818
1,305,863
kWh
|
- | $2,722 | - | |
| 05 | 2.4112: Install soft-start to eliminate nuisance trips | $9,688 | $11,100 |
$8,157
140,491
kWh
|
$1,195
-
kW-mo/yr
|
$336 | - | |
| 06 | 2.7135: Install occupancy sensors | $10,455 | $14,400 |
$10,093
173,842
kWh
|
- | $362 | - | |
| TOTAL RECOMMENDED | $153,188 | $54,200 |
$118,691
2,044,288
kWh
|
$3,087
-
kW-mo/yr
|
$4,372 |
$27,038
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $27,467 | $8,700 |
$24,623
424,092
kWh
|
$1,892
-
kW-mo/yr
|
$952 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs