Assessment Year | 2020 |
---|---|
Principal Product | Fork Lift Components |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $50 M to 100M |
# of Employees | 520 |
Plant Area |
300,000
ft2
|
Annual Production | 239,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,433,520 | 24,689,864 |
kWh
|
$0.058 |
Electricity Demand | $175,499 | 41,550 |
kW-mo/yr
|
$4.22 |
Electricity Fees | $57,729 | - |
|
- |
Natural Gas | $423,510 | 54,218 |
MMBtu
|
$7.81 |
TOTAL YEARLY COSTS | $2,090,258 | |||
RECOMMENDED SAVINGS* | $153,188 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,467 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $15,905 | $2,000 |
$13,960
240,444
kWh
|
$1,394
-
kW-mo/yr
|
$551 | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,562 | $6,700 |
$10,663
183,648
kWh
|
$498
-
kW-mo/yr
|
$401 | - | |
03 | 2.1113: Reduce combustion air flow to optimum | $27,038 | $15,000 | - | - | - |
$27,038
-
MMBtu
|
|
04 | 2.7241: Install outside air damper / economizer on hvac unit | $78,540 | $5,000 |
$75,818
1,305,863
kWh
|
- | $2,722 | - | |
05 | 2.4112: Install soft-start to eliminate nuisance trips | $9,688 | $11,100 |
$8,157
140,491
kWh
|
$1,195
-
kW-mo/yr
|
$336 | - | |
06 | 2.7135: Install occupancy sensors | $10,455 | $14,400 |
$10,093
173,842
kWh
|
- | $362 | - | |
TOTAL RECOMMENDED | $153,188 | $54,200 |
$118,691
2,044,288
kWh
|
$3,087
-
kW-mo/yr
|
$4,372 |
$27,038
-
MMBtu
|
||
TOTAL IMPLEMENTED | $27,467 | $8,700 |
$24,623
424,092
kWh
|
$1,892
-
kW-mo/yr
|
$952 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs