ITAC Assessment: UK1807
ITAC logo
ITAC Assessment: UK1807
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 16,600
ft2
Annual Production 2,920,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $530,902 7,165,800
kWh
Electricity Demand $131,160 14,366
kW-mo/yr
Electricity Fees $135,684 -
Natural Gas $3,475 421
MMBtu
TOTAL YEARLY COSTS $801,221
RECOMMENDED SAVINGS* $318,703 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $106 - $106
1,426
kWh
- - -
02 2.7145: Install skylights $126 $40 $126
1,708
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,341 $12,798 $11,197
151,317
kWh
$3,144
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $1,191 $690 $1,191
16,103
kWh
- - -
05 2.4152: Use only certified motor repair shops $2,941 $378 $2,505
33,849
kWh
$427
-
kW-mo/yr
- $9
06 2.6212: Turn off equipment during breaks, reduce operating time $290,152 $2,325 $290,152
3,920,976
kWh
- - -
07 2.6218: Turn off equipment when not in use $2,101 $500 $887
11,981
kWh
- $1,214
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $213 $12 $182
2,453
kWh
$31
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,532 $3,400 $6,448
87,133
kWh
$1,084
-
kW-mo/yr
- -
TOTAL RECOMMENDED $318,703 $20,143 $312,794
4,226,946
kWh
$4,686
-
kW-mo/yr
$1,214
-
MMBtu
$9
TOTAL IMPLEMENTED $28,551 $17,818 $22,642
305,970
kWh
$4,686
-
kW-mo/yr
$1,214
-
MMBtu
$9
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs