ITAC Assessment: UK1712
ITAC logo
ITAC Assessment: UK1712
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Men's and Women's Clothing
NAICS 315220: Men’s and Boys’ Cut and Sew Apparel Manufacturing
SIC 2326: Men's and Boys' Work Clothing
Sales Range $100
M
to 500
M
# of Employees 710
Plant Area 840,000
ft2
Annual Production 2,600,000
units
Production Hrs. Annual 6,600
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $382,064 11,024,000
kWh
Electricity Demand $420,425 20,213
kW-mo/yr
Electricity Fees $5,361 -
Natural Gas $20,201 5,977
MMBtu
Waste Disposal Costs
Water Usage $7,519 1,153
Tgal
Water Disposal $19,916 1,153
Tgal
TOTAL YEARLY COSTS $855,486
RECOMMENDED SAVINGS* $186,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $66,864 $7,493 $32,170
919,144
kWh
$34,694
-
kW-mo/yr
- - - -
02 2.7124: Make a practice of turning off lights when not needed $37,683 - $18,110
517,440
kWh
$19,573
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,140 $11,343 $3,527
100,769
kWh
$7,613
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $1,664 $1,288 $1,664
47,544
kWh
- - - - -
05 2.4152: Use only certified motor repair shops $15,253 - $2,358
67,381
kWh
$2,538
-
kW-mo/yr
- - - $10,357
06 2.6212: Turn off equipment during breaks, reduce operating time $2,154 $926 $2,154
61,545
kWh
- - - - -
07 2.7224: Reduce space conditioning during non-working hours $25,486 - $25,486
728,160
kWh
- - - - -
08 2.7224: Reduce space conditioning during non-working hours $10,498 - $8,909
254,544
kWh
- $1,589
-
MMBtu
- - -
09 3.4155: Meter waste water $6,463 - - - - $1,765
-
Tgal
$4,698
-
Tgal
-
10 3.4155: Meter waste water $2,076 $253 - - - - $2,076
-
Tgal
-
11 2.4231: Reduce the pressure of compressed air to the minimum required $2,508 - $2,508
71,652
kWh
- - - - -
12 2.4322: Use or replace with energy efficient substitutes $905 $1,053 $260
7,426
kWh
$645
-
kW-mo/yr
- - - -
13 2.4239: Eliminate or reduce compressed air usage $3,790 $3,458 $3,790
108,291
kWh
- - - - -
TOTAL RECOMMENDED $186,484 $25,814 $100,936
2,883,896
kWh
$65,063
-
kW-mo/yr
$1,589
-
MMBtu
$1,765
-
Tgal
$6,774
-
Tgal
$10,357
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs