Assessment Year | 2017 |
---|---|
Principal Product | Wooden and Laminated Cabinets |
NAICS | 337110: Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2434: Wood Kitchen Cabinets |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
310,000
ft2
|
Annual Production | 554,400
units
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,035 | 4,964,160 |
kWh
|
$0.033 |
Electricity Demand | $299,796 | 18,883 |
kW-mo/yr
|
$15.88 |
Electricity Fees | $5,411 | - |
|
- |
Natural Gas | $61,629 | 20,793 |
MMBtu
|
$2.96 |
TOTAL YEARLY COSTS | $532,871 | |||
RECOMMENDED SAVINGS* | $43,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4152: Use only certified motor repair shops | $10,415 | $8,440 |
$4,385
132,880
kWh
|
$6,030
-
kW-mo/yr
|
- | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $9,847 | $4,000 |
$9,847
298,400
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,878 | $11,800 |
$1,848
56,000
kWh
|
$2,030
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $257 | $384 |
$257
7,784
kWh
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,902 | $10,000 |
$2,387
72,330
kWh
|
$1,515
-
kW-mo/yr
|
- | |
06 | 2.7293: Install dry sprinkler system or other method to reduce heating requirements | $1,690 | $2,875 |
$1,039
31,481
kWh
|
$651
-
kW-mo/yr
|
- | |
07 | 2.1114: Limit and control secondary combustion air in furnace | $3,158 | $393 | - | - |
$3,158
-
MMBtu
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,875 | $1,500 | - | - |
$1,875
-
MMBtu
|
|
09 | 2.4239: Eliminate or reduce compressed air usage | $2,426 | $1,350 |
$2,426
74,608
kWh
|
- | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,915 | - |
$1,688
51,173
kWh
|
$227
-
kW-mo/yr
|
- | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,452 | $2,100 |
$1,452
44,000
kWh
|
- | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,682 | $5,300 |
$840
23,350
kWh
|
$842
-
kW-mo/yr
|
- | |
13 | 2.7134: Use photocell controls | $1,070 | $800 |
$1,070
29,744
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,567 | $48,942 |
$27,239
821,750
kWh
|
$11,295
-
kW-mo/yr
|
$5,033
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs