Assessment Year | 2003 |
---|---|
Principal Product | Corrugated boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
200,000
ft2
|
Annual Production | 637,000
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $300,406 | 4,138,000 |
kWh
|
$0.073 |
Electricity Demand | $70,454 | 12,330 |
kW-mo/yr
|
$5.71 |
Electricity Fees | $807 | - |
|
- |
Natural Gas | $104,497 | 11,119 |
MMBtu
|
$9.40 |
Fuel Oil #2 | $133,200 | 28,456 |
MMBtu
|
$4.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,845 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,310 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $27,237 | $1,300 | - | - |
$27,237
-
MMBtu
|
- | - | |
02 | 2.7314: Reduce ventilation air | $16,298 | $34,450 | - | - |
$16,298
-
MMBtu
|
- | - | |
03 | 2.2128: Use steam condensate for hot water supply (non-potable) | $10,803 | $25,625 | - | - |
$9,406
-
MMBtu
|
$1,151
-
MMBtu
|
$246
-
Tgal
|
|
04 | 2.7131: Add area lighting switches | $8,645 | $3,215 |
$8,645
131,789
kWh
|
- | - | - | - | |
05 | 2.3212: Optimize plant power factor | $5,140 | $15,455 | - |
$5,140
-
kW-mo/yr
|
- | - | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $2,624 | $6,120 |
$(-628.0)
(-8,966)
kWh
|
$(-42.0)
-
kW-mo/yr
|
$3,294
-
MMBtu
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,098 | $1,090 |
$1,098
14,482
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $71,845 | $87,255 |
$9,115
137,305
kWh
|
$5,098
-
kW-mo/yr
|
$56,235
-
MMBtu
|
$1,151
-
MMBtu
|
$246
-
Tgal
|
||
TOTAL IMPLEMENTED | $28,310 | $51,505 |
$9,115
137,305
kWh
|
$5,098
-
kW-mo/yr
|
$12,700
-
MMBtu
|
$1,151
-
MMBtu
|
$246
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs