ITAC Assessment: UK1503
ITAC logo
ITAC Assessment: UK1503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Fiberglass Reinforced Panels
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 109
Plant Area 103,000
ft2
Annual Production 52,000
thousand feet
Production Hrs. Annual 4,800
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,823 3,352,868
kWh
Electricity Demand $124,977 10,141
kW-mo/yr
Electricity Fees $26,839 -
Natural Gas $214,942 31,395
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,244

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings
01 2.7111: Reduce illumination to minimum necessary levels $605 $960 $605
11,471
kWh
- - - -
02 2.7134: Use photocell controls $3,487 $4,040 $3,487
66,166
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $945 $520 $346
6,566
kWh
- - $599 -
04 2.4224: Upgrade controls on compressors $5,138 $3,760 $2,874
54,544
kWh
$2,264
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $2,831 $3,000 $1,729
32,800
kWh
$1,102
-
kW-mo/yr
- - -
06 2.4131: Size electric motors for peak operating efficiency $16,001 $5,000 $11,727
222,526
kWh
$4,274
-
kW-mo/yr
- - -
07 2.6127: Maintain air filters by cleaning or replacement $1,126 $1,460 $1,126
21,363
kWh
- - - -
08 3.4151: Minimize water usage $556 $2,470 - - - - $556
-
Tgal
09 2.2511: Insulate bare equipment $17,159 $9,380 - - $17,159
-
MMBtu
- -
10 2.6218: Turn off equipment when not in use $2,034 $2,460 - - $2,034
-
MMBtu
- -
11 2.2442: Preheat combustion air with waste heat $62,362 $45,000 - - $62,362
-
MMBtu
- -
TOTAL RECOMMENDED $112,244 $78,050 $21,894
415,436
kWh
$7,640
-
kW-mo/yr
$81,555
-
MMBtu
$599 $556
-
Tgal
TOTAL IMPLEMENTED $112,244 $78,050 $21,894
415,436
kWh
$7,640
-
kW-mo/yr
$81,555
-
MMBtu
$599 $556
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Water Consumption Savings