ITAC Assessment: UK1403
ITAC logo
ITAC Assessment: UK1403
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Steel Pipe
NAICS 331210: Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317: Steel Pipe and Tubes
Sales Range $100
M
to 500
M
# of Employees 268
Plant Area 529,000
ft2
Annual Production 300,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,446,054 28,967,439
kWh
Electricity Demand $518,475 77,583
kW-mo/yr
Electricity Fees $250,640 -
Natural Gas $148,241 19,668
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,039,606 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $321,178

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.3212: Optimize plant power factor $56,910 $52,500 - - $56,910 - - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,517 - $2,517
45,759
kWh
- - - - - - -
03 2.8114: Change rate schedules or other changes in utility service $4,250 - - - - - $4,250 - - -
04 3.4116: Meter recycled water (to reduce sewer charges) $26,100 - - - - - - $26,100
-
Tgal
- -
05 3.4154: Eliminate leaks in water lines and valves $69,620 $7,000 - - - - - $69,620
-
Tgal
- -
06 2.7111: Reduce illumination to minimum necessary levels $4,405 - $3,710
67,452
kWh
$695
-
kW-mo/yr
- - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $132,390 $479,700 $89,643
1,629,876
kWh
$16,431
-
kW-mo/yr
- $26,316 - - - -
08 3.4151: Minimize water usage $68,700 $5,200 - - - - - $68,700
-
Tgal
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $50,851 $9,648 $50,851
924,567
kWh
- - - - - - -
10 4.322: Eliminate old stock and modify inventory control $250,000 $100,000 - - - - - - - $250,000
11 2.4224: Upgrade controls on compressors $14,129 $40,000 $11,903
216,411
kWh
$2,226
-
kW-mo/yr
- - - - - -
12 2.7134: Use photocell controls $3,867 $947 $3,867
70,303
kWh
- - - - - - -
13 2.4224: Upgrade controls on compressors $3,017 - $3,017
54,855
kWh
- - - - - - -
14 4.322: Eliminate old stock and modify inventory control $318,750 - - - - - - - $318,750 -
15 3.4116: Meter recycled water (to reduce sewer charges) $34,100 $5,000 - - - - - $34,100
-
Tgal
- -
TOTAL RECOMMENDED $1,039,606 $699,995 $165,508
3,009,223
kWh
$19,352
-
kW-mo/yr
$56,910 $26,316 $4,250 $198,520
-
Tgal
$318,750 $250,000
TOTAL IMPLEMENTED $321,178 $502,295 $144,361
2,624,746
kWh
$16,431
-
kW-mo/yr
- $26,316 $4,250 $129,820
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs