ITAC Assessment: UK1401
ITAC logo
ITAC Assessment: UK1401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Winches, couplers, and jacks
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 120,000
ft2
Annual Production 1,273,053
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,035 836,540
kWh
Electricity Demand $40,227 3,086
kW-mo/yr
Electricity Fees $13,763 -
Natural Gas $20,667 3,085
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings
01 2.4224: Upgrade controls on compressors $13,717 $15,000 $8,095
188,247
kWh
$5,622
-
kW-mo/yr
- - -
02 2.2437: Recover waste heat from equipment $4,150 $2,500 - - - $4,150
-
MMBtu
-
03 2.2135: Repair and eliminate steam leaks $1,910 $4,165 - - - $1,910
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,825 $1,500 $1,666
38,742
kWh
$1,159
-
kW-mo/yr
- - -
05 2.6124: Establish equipment maintenance schedule $3,001 $2,080 $1,766
41,077
kWh
$1,235
-
kW-mo/yr
- - -
06 2.7243: Improve air circulation with destratification fans / other methods $2,590 $7,550 - - - $2,590
-
MMBtu
-
07 2.7135: Install occupancy sensors $2,274 $860 $1,336
31,068
kWh
$938
-
kW-mo/yr
- - -
08 2.3212: Optimize plant power factor $1,337 $2,135 - - $1,337 - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $689 $840 $689
16,025
kWh
- - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,297 - $765
17,800
kWh
$532
-
kW-mo/yr
- - -
11 2.4221: Install compressor air intakes in coolest locations $1,087 $700 $650
15,116
kWh
$437
-
kW-mo/yr
- - -
12 2.7124: Make a practice of turning off lights when not needed $666 $86 $471
10,950
kWh
$195
-
kW-mo/yr
- - -
13 2.7134: Use photocell controls $249 $222 $136
3,154
kWh
$113
-
kW-mo/yr
- - -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $53 $65 $19
461
kWh
$31
-
kW-mo/yr
- - $3
15 2.7224: Reduce space conditioning during non-working hours $68 - $7
153
kWh
- - $61
-
MMBtu
-
16 2.6218: Turn off equipment when not in use $79 - $79
1,847
kWh
- - - -
TOTAL RECOMMENDED $35,992 $37,703 $15,679
364,640
kWh
$10,262
-
kW-mo/yr
$1,337 $8,711
-
MMBtu
$3
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs