ITAC Assessment: UK1317
ITAC logo
ITAC Assessment: UK1317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Oral Solid Dosage Drugs
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 100,000
ft2
Annual Production 440,925
lb
Production Hrs. Annual 8,400
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $490,313 14,067,000
kWh
Electricity Demand $356,979 27,598
kW-mo/yr
Electricity Fees $131,240 -
Natural Gas $343,978 71,099
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $154,048

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $139,142 $342,000 $49,934
1,430,768
kWh
$26,439
-
kW-mo/yr
- $62,769
-
MMBtu
02 2.3212: Optimize plant power factor $11,706 $17,700 - - $11,706 -
03 2.4224: Upgrade controls on compressors $15,719 $35,000 $15,719
450,398
kWh
- - -
04 3.1161: Eliminate/reduce an operation $12,899 - $12,899
369,600
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $8,519 - $5,570
159,600
kWh
$2,949
-
kW-mo/yr
- -
06 2.7211: Clean and maintain refrigerant condensers and towers $3,200 $1,900 $3,200
92,490
kWh
- - -
TOTAL RECOMMENDED $191,185 $396,600 $87,322
2,502,856
kWh
$29,388
-
kW-mo/yr
$11,706 $62,769
-
MMBtu
TOTAL IMPLEMENTED $154,048 $361,600 $53,134
1,523,258
kWh
$26,439
-
kW-mo/yr
$11,706 $62,769
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs