ITAC Assessment: UK1314
ITAC logo
ITAC Assessment: UK1314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Linear actuation systems
NAICS 333995: Fluid Power Cylinder and Actuator Manufacturing
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 125,000
ft2
Annual Production 725,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,200 1,738,400
kWh
Electricity Demand $64,785 4,502
kW-mo/yr
Electricity Fees $10,441 -
Natural Gas $19,970 3,294
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,276 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $12,434 $44,000 $2,510
61,300
kWh
$3,100
-
kW-mo/yr
- $6,824
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $7,512 $28,560 $2,751
67,100
kWh
$4,634
-
kW-mo/yr
- $127
-
MMBtu
03 2.2437: Recover waste heat from equipment $3,739 $4,500 - - - $3,739
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $5,453 $15,000 $5,453
133,000
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $4,066 - $2,374
59,000
kWh
$1,692
-
kW-mo/yr
- -
06 2.8114: Change rate schedules or other changes in utility service $2,594 - - - $2,594 -
07 2.6218: Turn off equipment when not in use $1,662 $650 $1,107
27,011
kWh
$555
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $798 $700 $539
13,140
kWh
$259
-
kW-mo/yr
- -
09 2.7134: Use photocell controls $328 $592 $328
8,000
kWh
- - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $690 $690 $466
11,357
kWh
$224
-
kW-mo/yr
- -
TOTAL RECOMMENDED $39,276 $94,692 $15,528
379,908
kWh
$10,464
-
kW-mo/yr
$2,594 $10,690
-
MMBtu
TOTAL IMPLEMENTED $39,276 $94,692 $15,528
379,908
kWh
$10,464
-
kW-mo/yr
$2,594 $10,690
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs