ITAC Assessment: LE0102
ITAC logo
ITAC Assessment: LE0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Heat treated strip steel
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $5
M
to 10
M
# of Employees 34
Plant Area 42,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $129,955 1,406,652
kWh
Electricity Demand $3,774 304
kW-mo/yr
Natural Gas $152,993 24,827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Primary Product Savings
01 2.2514: Cover open tanks $2,872 $850 - - - $2,872
-
MMBtu
- - -
02 4.445: Install equipment to move product $20,280 $9,800 - - - - - - $20,280
03 2.4221: Install compressor air intakes in coolest locations $255 $550 $200
2,156
kWh
$55
-
kW-mo/yr
- - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $236 - $194
2,172
kWh
$42
-
kW-mo/yr
- - - - -
05 3.5316: Contract a wood pallet recycling company $6,500 - - - - - - $6,500
-
gal
-
06 3.5248: Separate and recycle scrap metal to foundry or for sale $15,000 $11,500 - - - - $15,000
-
Tgal
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,323 - - - $4,323 - - - -
TOTAL RECOMMENDED $49,466 $22,700 $394
4,328
kWh
$97
-
kW-mo/yr
$4,323 $2,872
-
MMBtu
$15,000
-
Tgal
$6,500
-
gal
$20,280
TOTAL IMPLEMENTED $6,500 - - - - - - $6,500
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs