ITAC Assessment: SD0373
ITAC logo
ITAC Assessment: SD0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Cookie
NAICS 311821: Cookie and Cracker Manufacturing
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 80,000
ft2
Annual Production 4,600,000
lb
Production Hrs. Annual 6,468
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,869 1,567,182
kWh
Electricity Demand $63,805 4,247
kW-mo/yr
Natural Gas $67,841 8,173
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $260,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7273: Install desiccant humidity control system $34,083 $56,520 - - $34,083
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,494 $3,900 $4,948
53,900
kWh
$4,506
-
kW-mo/yr
$(-1,960.0)
-
MMBtu
-
03 2.6212: Turn off equipment during breaks, reduce operating time $6,208 - $5,066
55,188
kWh
$1,142
-
kW-mo/yr
- -
04 2.4235: Remove or close off unneeded compressed air lines $1,475 $450 $1,475
16,068
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $13,918 $36,052 $10,677
116,308
kWh
$3,241
-
kW-mo/yr
- -
06 2.7134: Use photocell controls $4,982 $615 $4,982
54,273
kWh
- - -
07 2.7135: Install occupancy sensors $3,212 $90 $3,212
34,992
kWh
- - -
08 4.441: Install automatic packing equipment $171,742 $50,000 - - - $171,742
09 4.446: Automate finishing process $17,209 $30,000 - - - $17,209
TOTAL RECOMMENDED $260,323 $177,627 $30,360
330,729
kWh
$8,889
-
kW-mo/yr
$32,123
-
MMBtu
$188,951
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs