ITAC Assessment: UK1214
ITAC logo
ITAC Assessment: UK1214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product engines
NAICS 333618: Other Engine Equipment Manufacturing
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 97
Plant Area 92,000
ft2
Annual Production 7,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,628 1,580,431
kWh
Electricity Demand $95,999 8,739
kW-mo/yr
Electricity Fees $37,352 -
Natural Gas $18,357 2,236
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings
01 3.4114: Replace city water with recycled water via cooling tower $57,123 $150,767 - - - $57,123
-
Tgal
02 2.4224: Upgrade controls on compressors $10,251 $11,250 $4,454
127,255
kWh
$5,797
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $6,631 $11,880 - - $6,631 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $546 $500 $546
15,600
kWh
- - -
TOTAL RECOMMENDED $74,551 $174,397 $5,000
142,855
kWh
$5,797
-
kW-mo/yr
$6,631 $57,123
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs