ITAC Assessment: UF0646
ITAC logo
ITAC Assessment: UF0646
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Engine Blades
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $100
M
to 500
M
# of Employees 80
Plant Area 30,000
ft2
Annual Production 20,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,430 2,725,464
kWh
Electricity Demand $142,874 6,312
kW-mo/yr
Electricity Fees $50,805 -
TOTAL YEARLY COSTS $333,109
RECOMMENDED SAVINGS* $222,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $97,535 $375,213 $36,420
714,109
kWh
$61,115
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $27,587 $20,669 $7,531
147,670
kWh
$20,056
-
kW-mo/yr
- -
03 2.3191: Use demand controller or load shedder $19,731 $14,663 $9,730
190,782
kWh
$10,001
-
kW-mo/yr
- -
04 2.4112: Install soft-start to eliminate nuisance trips $5,657 $8,456 $5,657
110,920
kWh
- - -
05 2.6231: Utilize controls to operate equipment only when needed $2,780 $7,500 $2,780
54,509
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,900 - $1,900
37,255
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $770 - $770
15,107
kWh
- - -
08 2.4237: Substitute compressed air cooling with water or air cooling $631 $2,700 $631
12,365
kWh
- - -
09 4.448: Install automatic part storage / retreval system $16,655 $75,000 - - - $16,655
10 4.424: Improve space comfort conditioning $45,534 $22,638 $(-1,398.0)
(-27,404)
kWh
$(-2,863.0)
-
kW-mo/yr
$49,795 -
11 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud $4,169 $15,000 $4,169
81,754
kWh
- - -
TOTAL RECOMMENDED $222,949 $541,839 $68,190
1,337,067
kWh
$88,309
-
kW-mo/yr
$49,795 $16,655
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs