Assessment Year | 2005 |
---|---|
Principal Product | Plastic Bottles |
NAICS | 326160: Plastics Bottle Manufacturing |
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
180,000
ft2
|
Annual Production | 68,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $623,593 | 13,565,600 |
kWh
|
$0.046 |
Electricity Demand | $142,289 | 24,045 |
kW-mo/yr
|
$5.92 |
Electricity Fees | $102,909 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $71,277 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.445: Install equipment to move product | $30,000 | $20,000 | - | - | $30,000 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,226 | $1,350 |
$7,652
160,981
kWh
|
$1,574
-
kW-mo/yr
|
- | |
03 | 3.1191: Change procedures / equipment / operating conditions | $7,803 | $560 |
$6,668
144,729
kWh
|
$1,135
-
kW-mo/yr
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $5,952 | $400 |
$5,952
113,141
kWh
|
- | - | |
05 | 2.2511: Insulate bare equipment | $4,352 | $1,010 |
$4,352
67,012
kWh
|
- | - | |
06 | 2.7261: Install timers and/or thermostats | $3,825 | $346 |
$3,825
82,500
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $828 | - |
$828
17,904
kWh
|
- | - | |
08 | 2.4239: Eliminate or reduce compressed air usage | $685 | $156 |
$685
15,006
kWh
|
- | - | |
09 | 2.7221: Lower temperature during the winter season and vice-versa | $8,606 | $23,253 |
$8,606
185,847
kWh
|
- | - | |
TOTAL RECOMMENDED | $71,277 | $47,075 |
$38,568
787,120
kWh
|
$2,709
-
kW-mo/yr
|
$30,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs