Assessment Year | 1997 |
---|---|
Principal Product | animal feeds |
NAICS |
n/a
|
SIC | 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats |
Sales Range | $5 M to 10M |
# of Employees | 23 |
Plant Area |
42,150
ft2
|
Annual Production | 60,000
ton
|
Production Hrs. Annual | 3,248
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $28,768 | 1,017,878 |
kWh
|
$0.028 |
Electricity Demand | $52,441 | 6,113 |
kW-mo/yr
|
$8.58 |
Electricity Fees | $132 | - |
|
- |
Natural Gas | $37,242 | 10,688 |
MMBtu
|
$3.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,995 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,995 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $7,800 | $5,000 | - |
$7,800
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,420 | $280 |
$640
22,860
kWh
|
$780
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $365 | $498 |
$163
5,862
kWh
|
$202
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $210 | $440 |
$100
3,517
kWh
|
$110
-
kW-mo/yr
|
- | |
05 | 3.6192: Use a less expensive method of waste removal | $200 | - | - | - |
$200
-
lb
|
|
TOTAL RECOMMENDED | $9,995 | $6,218 |
$903
32,239
kWh
|
$8,892
-
kW-mo/yr
|
$200
-
lb
|
||
TOTAL IMPLEMENTED | $9,995 | $6,218 |
$903
32,239
kWh
|
$8,892
-
kW-mo/yr
|
$200
-
lb
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs