ITAC Assessment: CO0404
ITAC logo
ITAC Assessment: CO0404
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product animal feeds
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $5
M
to 10
M
# of Employees 23
Plant Area 42,150
ft2
Annual Production 60,000
ton
Production Hrs. Annual 3,248
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,768 1,017,878
kWh
Electricity Demand $52,441 6,113
kW-mo/yr
Electricity Fees $132 -
Natural Gas $37,242 10,688
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,995 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,995

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,800 $5,000 - $7,800
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,420 $280 $640
22,860
kWh
$780
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $365 $498 $163
5,862
kWh
$202
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $210 $440 $100
3,517
kWh
$110
-
kW-mo/yr
-
05 3.6192: Use a less expensive method of waste removal $200 - - - $200
-
lb
TOTAL RECOMMENDED $9,995 $6,218 $903
32,239
kWh
$8,892
-
kW-mo/yr
$200
-
lb
TOTAL IMPLEMENTED $9,995 $6,218 $903
32,239
kWh
$8,892
-
kW-mo/yr
$200
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs